WEBCODE.AGENCY
GET IN TOUCH
GET IN TOUCH
Servers & VPN

How to move a website to a new host or VPS without downtime

In short: a website moves without downtime when the new copy is fully set up and tested before the domain is switched. The order is: list everything running on the server, back it up, copy it to the new server, test pages, forms, payments and email, run a final database sync, and only then switch DNS. The old server keeps running in parallel for a few more days as a safety net.

When it’s time to move your website to a new host

Companies move their website when the current hosting can no longer keep up with the business: the site slows down at peak hours, the team needs a CRM and integrations that shared hosting can’t run, or the data has to live in a data center in another country. Which option to choose is covered in “Shared hosting, VPS or dedicated server”. This article is about the move itself.

What gets migrated in a website migration

A website is more than files and a database. A server usually runs much more, and every item has to be moved and checked:

WhatWhy it matters
Site files and uploadsProduct photos, documents, files from customers
DatabaseOrders, customers, products, leads
Server settingsPHP or Node.js version, redirects, upload limits
Scheduled tasks (cron)Product feeds, sync with accounting, newsletters
IntegrationsPayments, shipping, CRM, accounting, marketplaces
IP address on allowlistsBanks, payment providers and accounting software often accept requests only from a known address
Email and DNS recordsForm notifications, company email, order confirmations
SSL certificateWithout it, browsers show a warning instead of your site

What to prepare before the migration

A migration runs fast when all the access is collected in advance. Have ready:

  • Access to your domain registrar or the service where your DNS is managed. That’s where the server address changes on moving day.
  • Access to the old hosting panel or server: files, databases, email settings.
  • Access to payment providers, your bank and accounting software, to add the new IP address to their allowlists.
  • A list of integrations and services your site works with: CRM, shipping, marketplaces, email marketing.
  • A contact person who can quickly place a test order or submit a test lead on the business side.

Why websites go down during a migration

Downtime during a move almost always comes from one of five causes:

  • The domain was switched before the site was ready. Some visitors land on an empty or half-configured server.
  • Orders got “lost” between the copy and the switch. The database was copied in the morning and the domain switched in the evening — everything that came in during the day stayed on the old server.
  • Scheduled tasks were forgotten. The site opens, but products don’t update and the accounting sync has stopped.
  • The new IP isn’t on an allowlist. Payments or bank sync stop going through, even though the site works.
  • Site emails land in spam. The server changed, but the email records didn’t.

All of this is predictable, so a plan covers it.

How to migrate a website without downtime: a 9-step plan

  1. Inventory everything running on the server. Sites, databases, scheduled tasks, integrations, email, DNS records. This becomes the checklist at the end.
  2. Full backup of the old server. Files, databases, settings and DNS records are saved separately before any changes. This is the baseline for the whole migration.
  3. Lower the DNS TTL in advance. TTL is how long internet providers cache your server’s address. A day or two before the move it’s lowered to a few minutes, so on switch day the new address spreads quickly.
  4. Deploy a copy on the new server. Files, database, settings, SSL, scheduled tasks — so the new server is a complete copy of the old one.
  5. Test before the switch. The copy is opened on the new server while customers keep using the old one: pages, cart, forms, payments, account login, emails. The new IP is added to bank and service allowlists in advance.
  6. Final database sync. The last copy of the database is taken right before the switch, during the quietest hours, so no order or lead is lost.
  7. Switch the domain. The DNS record is pointed to the new server. Thanks to the low TTL, visitors move over within minutes.
  8. The old server runs in parallel. It stays active for a few more days: requests that still reach it through cached DNS are handled too.
  9. Monitoring and a second check. Errors, speed, emails, accounting sync — against the list from step one.

Planning a move?

Send us your site address — we’ll tell you what to check in your case.

Ask us →

Email and site notifications after the move

Email is a separate part of any migration. Keep two things apart:

  • Company email (your team’s mailboxes). If it runs on Google Workspace or another email service, moving the website doesn’t affect it: the MX records in DNS stay as they are.
  • Emails the site sends itself: form leads, order confirmations, password resets. After the move they are sent by the new server, so the SPF, DKIM and DMARC records are updated for it. That way emails reach the inbox, not spam.

Google lists the requirements for email that Gmail accepts in its email sender guidelines.

How to keep your Google rankings after a migration

If the domain and page URLs stay the same, a move to another server is just a new IP address for Google. Rankings hold as long as the site stays available and is no slower than before. How Google crawls a site in this case is described in Google Search Central.

If the domain or URL structure changes along with the move, you need permanent 301 redirects from every old page to the new one and a notice in Search Console via the Change of Address tool. The full procedure is in Google’s site move guide.

Tip

Move servers and change the domain or design in separate stages. That makes it easier to see what affected traffic and speed, and Google re-indexes the site more smoothly.

Migrating WordPress, OpenCart and other CMS sites

The migration plan is the same for any website, but popular CMSs have their own specifics:

  • WordPress stores the site address in the database. If the domain stays the same, it isn’t touched, and the copy is tested on the new server under the real domain through a local computer setting (the hosts file). After the move, plugin caches are cleared and permalinks and WP-Cron jobs are checked.
  • OpenCart stores server folder paths in two config files — one for the store, one for the admin. On the new server they are updated, the storage folder is moved if it sits outside the site root, and theme and modification caches are cleared.
  • For any CMS, the PHP version and extensions are checked: the new server must match what the site needs, and a version upgrade is better done as a separate step after the move.

Website migration checklist: what to check after the move

CheckHow
Site opens over HTTPSHome page, catalog, product page, no browser warnings
Forms and leadsA test lead reaches your inbox and CRM
Cart and paymentA test order from cart to confirmation
Site emailsLand in the inbox, not spam
Scheduled tasksProducts, prices and stock update on schedule
IntegrationsSync with accounting, shipping and marketplaces goes through
SpeedPageSpeed Insights scores no lower than before the move
AnalyticsGoogle Analytics and Search Console see visitors, no crawl errors

From our practice

A real estate website in Italy: a catalog of 40,000+ properties, each with its own listing page with photos and details. We moved the site and database to our server following the plan above. The switch went so smoothly that neither visitors nor the client’s team noticed anything.

Right after the move, before any optimization, the site became noticeably faster: Google PageSpeed went from 39 to 68 on mobile and from 45 to 89 on desktop, purely thanks to the server’s dedicated resources.

Old hostingOur server
Properties in the catalog40,000+40,000+
Google PageSpeed, mobile3968
Google PageSpeed, desktop4589

PageSpeed scores at the time of measurement.

Moving your website to a VPS with WebCode.Agency

At WebCode.Agency, setup and migration are included in the plan, and the new server is ready within 4 hours of payment. We deploy a copy on the new server, test pages, forms, payments and email, and then switch the domain. The old server stays active for a few more days as a safety net.

After the move, the server runs under our watch: SSL, 24/7 monitoring and a monthly health check are included. You can add resources later without another move, and run several sites, a CRM or email on one VPS. Plans and data center locations are on the Cloud & Servers page.

We’ll move your website with zero downtime

Send us your site address — we’ll assess the move and suggest a server that fits your load.

Discuss the move →

FAQ

Can I move my website to a new host without downtime?

Yes. A copy of the site is deployed and tested on the new server while customers keep using the old one. The domain is switched only after testing, and the old server keeps running in parallel for a few more days.

How long does a website migration take?

The domain switch itself takes minutes. Preparation and testing depend on the site: a simple website or landing page takes from a few hours to a day, an online store or catalog with integrations usually 1–3 days, a large project with dozens of integrations up to a week. Throughout, customers keep using the old server as usual.

How long does DNS take to update after the switch?

If the TTL is lowered to a few minutes in advance, most visitors reach the new server within minutes. Some providers cache the old address longer, which is why the old server stays active for a few more days.

Will my site lose Google rankings after a migration?

If the domain and page URLs don’t change and the site stays stable and no slower, the move doesn’t affect rankings. If the domain changes, you need 301 redirects and a notice in Search Console.

Will orders placed during the migration be lost?

No, as long as the final database sync is done right before the domain switch, during the quietest hours.

How do I move a WordPress site to a new host without downtime?

The same way as any other site: a copy on the new server, testing under the real domain via the hosts file, a final database sync and a DNS switch. If the domain stays the same, the site address in the WordPress database doesn’t need to change.

Will you migrate my website?

Yes, setup and migration are included in the plan. We move the site, database, scheduled tasks and integrations, test everything and only then switch the domain.

Updated November 10, 2026

Andrew Proshchenko

Andrew Proshchenko

CEO, WebCode.Agency

Building digital solutions for business since 2012: websites, online stores, CRM and server infrastructure for mid-sized and large companies and the public sector. Personally accountable for the outcome of every project.

Read next

Related articles